Sunday, January 6, 2013

Current building configurations


Current Building Structure
Hughes:
16 classrooms total
13 General Ed Classrooms
(Resource Room, Music or Art would have to be displaced in order to have enough classrooms to house 14 classes)
(7/grade level x 2 grade levels=14)
Would also need to add a CI classroom


Currently:
1-Rk

2-K

2-1st

2-2nd

2-3rd

2-4th

2-5th

1-Resource Room

1-Art Room

1-Music Room/Nurses Office

Gordon:
13 classrooms total
12 General Ed Classrooms (1 currently housed in the purposed music room)
Music and Art as well as the technology computer lab would have to be displaced in order to have enough classrooms to house 14 classes
(7/grade x 2 grade levels=14)
Would also need to add a CI classroom

Currently:

2-k

2-1st

2-2nd

2-3rd

2-4th

2-5th

1-Music/Art Room (Music was already displaced from it's bond money space due to 5th grade)

1-Resource Room (Housed at the Shamrock Preschool side due to displacement from 5th grade)
Walters:
21 classrooms total
18 General Ed Classrooms, CI classroom is smaller than a purposed classroom, 4 Classrooms would sit empty

Currently:
3-K (1 in the purposed resource room due to 5th grade)

3-1st 

2-2nd

3-3rd

3-4th

3-5th 

1-CI

1-Resource Room

1-Music Room

1-Art Room (resource room shares this space when art is not there due to 5th grade)

This clearly indicates that 2 of our schools cannot possibly house the number of students we currently have enrolled, while the third wouldn't be utilizing all of the space that it was intended to use.

No comments:

Post a Comment